Materials & Labor Break-up (%) for Residential Building Project

 

Material Cost Break up
S. No Description  %
1 Cement 27.80%
2 Steel 18.60%
3 Sand 9.50%
4 Metal, Grit, Dust 5.10%
5 Wood ( Door frames & Shutters) 8.70%
6 Windows & Glazing 5.50%
7 Tiles 8.70%
8 Plumbing 7.90%
9 Other Building materials (rubble, morrum, bricks, brick bats,lime etc.,) 4.30%
10 Miscellaneous 3.90%
100.00%

 

Labour Cost Break up
S. No Description  %
1 RCC Work 33.00%
2 Masonry & Plaster work 22.00%
3 Plumbing work 4.00%
4 Waterproofing work 2.00%
5 Wood work 3.00%
6 Flooring, Skirting, Dadooing work 9.00%
7 Electrical work 15.00%
8 Painting work 7.00%
9 Departmental work 5.00%
100.00%

 

 